
Do Something – Eau Claire Community Serve Day
đź“… Sunday, August 10, 2025
📍 Village of Eau Claire
On Sunday, August 10, all four First Church campuses will unite as one church family to Do Something—serving together to make a tangible impact in the Village of Eau Claire. Whether you’re 8 or 88, there’s a place for everyone to jump in and lend a hand!
This all-church serve day is about more than just projects—it’s about being the hands and feet of Jesus, loving our neighbors through action, and showing up where it matters most. Together, we’ll tackle a wide range of community projects.
From high-impact outdoor efforts to gentle, behind-the-scenes kindnesses, there’s something for everyone to do—because when we serve together, we reflect the heart of God in powerful ways.
Mark your calendar, invite your friends and family, and let’s show Eau Claire what it means to restore God’s ideal—one act of service at a time.
Let’s Do Something… together.
REGISTRATION COMING SOON!!
TEAM PROJECTS AVAILABLE
Click on the down arrows to see Project Descriptions
Eau Claire Public Schools
- Team 1: Entry Light LandscapeDescription:
- Plant plants, mulch along entry sidewalk and around landscaped tree.
- 12 People – KID FRIENDLY
- Team 2: Entry Stenciled Painting
- Sand & Paint Railing. Stencil Stairs with school values. Paint overhang near the front door (white & Gray). Stencil “Welcome to Lybrook” to the R of the doors
- Able to Paint Stenciled Letters
- 8 Adults 16+ years old
- Team 3: Paint/Light Landscape
- Sand &Paint doors 2 & 3 at Elementary, Landscape – flowers, mulch the parent drop-off circle
- 10 People – KID FRIENDLY
- Team 4: Elementary School Exterior Paint
- Paint Maroon and gray panels
- Able to paint a wall
- 10 People – 13+ years old
- Team 5:Elementary School Exterior Paint
- Paint Maroon and gray panels
- Able to paint a wall
- 10 People – 13+ years old
- Team 1: Miscellaneous Repairs
- Repair Elementary Gym Door Awning, fill a washed out area under a section of sidewalk, repair Gaga pit. Replace picnic table top boards on 2 tables.
- Handy Adults who can use Power Tools
- 10 Adults
- Team 1 – Power Wash & Paint
- Power Wash plastic section then sand &paint metal section of the Jungle gym. Seal stairs if possible. Repaint two white benches
- Able to Paint
- 8 People – 13+ years old
- Team 2 – Paint Swing Sets & Metal Play Structure
- Sand and Paint both sets of swings and metal play structure.
- Able to Paint
- 14 People – KID FRIENDLY
- Team 3 – Fence Demolition
- Remove small wooden fence, remove pile of debris by east wall. Remove black corrugated pipe.
- Willing to use crowbars and sledgehammers
- 8 Adults
- Team 4 – Clear Fence Line
- Trim back and weed Fence line.
- Able to Clear Overgrowth
- 14 People – KID FRIENDLY
- Team 5 – Saw Dead limbs
- Description: Saw some lower branches from a tree in the middle of the playground, not very high.
- Able to Cut Dead Limbs on Large Tree with Chainsaw
- 2 Adults
- Team 6 – East Outdoor Stairs
- Edge the stairs, add Beaver graphic (school mascot), paint white arrows, sand & paint railing
- Able to Clear Weeds &Dirt from Stairs, Able to Use a Stencil with paint
- 8 Adults
- Team 1 – Playground Painting
- Sand & Paint swing set, paint play structure, paint tetherball poles.
- Able to paint
- 14 People – 13+ years old
- Team 2 – Paint Metal Gate
- Sand & Paint Parking lot gate and post to maroon.
- Able/willing to paint
- 4 People – KID FRIENDLY
- Team 3 – Clear Fence Line
- Trim back and weed Fence line to clear from overgrowth. Â
- Able to clear overgrowth
- 14 People – KID FRIENDLY
- Team 1:Â Assist with Library organization
- Lower impact
- 6 Adults
- Team 2:Â Organize and Purge Teacher Lounge at MSHS
- Anyone 13+
- 6 People
- Team 3: Organize and Purge MSHS Office
- Anyone 13+
- 6 People
- Team 4: Landscape at this MS/HS
- Weed and mulch Flower Beds @ MSHS
- 6 People
- KID FRIENDLY
- Team 5: Clean Concession stand at MSHS
- 6 People
- KID FRIENDLY
- Team 6: Clean Concession stand by Football Field
- 6 People
- KID FRIENDLY
- Team 7: Clean Stage area at Student Activity Center
- 6 People
- KID FRIENDLY
- Team 8: Landscape the Admin buildingÂ
- Weed and mulch Flower Beds @ White House (Admin Building)
- 6 People
- KID FRIENDLY
Village of Eau Claire
- Team 1 – (North of Main St)
- Junk Pick up crews will load what residents leave at the curb and dispose of in a 40 yard dumpster.
- Individuals ready and able to lift
- 3 People – 13+ years old + 1 person with a pick up truck or trailer to load items
- Team 2 – (South of Main St)
- Junk Pick up crews will load what residents leave at the curb and dispose of in a 40 yard dumpster.
- Individuals ready and able to lift
- 3 People – 13+ years old + 1 person with a pick up truck or trailer to load items
- Team 3 – (South of Main St)
- Junk Pick up crews will load what residents leave at the curb and dispose of in a 40 yard dumpster.
- Individuals ready and able to lift
- 3 People – 13+ years old + 1 person with a pick up truck or trailer to load items
- Team 1: Convert Tennis Courts
- Sweep, then paint the tennis courts with a resurfacing paint. Remove the dilapidated practice wall, refasten the top of the fence.
- 10 people – 13+ years old
- Team 1: Village Hall – 6625 E. Main
- Landscape the front
- Power wash the painted cherries on the sidewalk
- Paint the mailbox
- Wash awning
- Scrape and Paint the the maroon area above windows
- 8 People – 13+ years old
- Team 1 – Paint Fire Hydrants
- Scrape, sand, and paint the fire hydrants burgundy.Â
- Â 6 People –Â KID FRIENDLY (with guidance)
- Team 2 – Paint Fire Hydrants
- Scrape, sand, and paint the fire hydrants burgundy.Â
- Â 6 People –Â KID FRIENDLY (with guidance)
- Team 3 – Paint Fire Hydrants
- Scrape, sand, and paint the fire hydrants burgundy.Â
- Â 6 People –Â KID FRIENDLY (with guidance)
- Team 4 – Paint Fire Hydrants
- Scrape, sand, and paint the fire hydrants burgundy.Â
- Â 6 People –Â KID FRIENDLY (with guidance)
- Team 1: Artistic Fire Hydrant PaintingÂ
- Individuals can design and paint a fire hydrant using creativity and imagination – think out of the box, maybe a landscape or an animal or abstract
- 8 people who are artistic/creative –Â 15+ years old
- Team 1 – Little Creek Bridge Repair
- Remove walkway boards and top railing and replace with new boards.
- Handy people
- 6 Adults – including one who can bring a saw
- Team 2 – Paint Playground Equipment
- Sand/Paint playground equipment
- Able to paint
- 8 People – 13+ years old
- Team 3 – Paint Picnic Tables
- Sand & Paint 8 Picnic tables, an attached counter to the pavilion, and the wooden park “rules” sign
- Able to paint
- 6 People -b13+ years old
- Team 4 – General Park Clean Up
- Raking under trees, around pavilion, weed the sand volleyball court, general clean up
- 6 people – KID FRIENDLY
- Team 1 – Paint Playground Equipment
- Sand & Paint playground equipment
- Able to paint
- 16 People – 13+ years old
- Team 2 – Paint Picnic Tables and Pavilion
- Sand & Paint 8 Picnic tables, the pavilion, and the fence post & sign.
- Able to paint
- 12 People – KID FRIENDLY
- Team 3 – Paint the Out building
- Minimal scraping & sanding; Paint
- Able to paint
- 4 People – 16+ years old
- Team 4 – Paint chain link fence
- Paint chain link fence around the little outbuilding and water tower
- Able to paint
- 8 People – 13+ years old
- Team 5 – General Park Clean Up
- Raking under trees, around pavilion, picking up limbs, general clean up, power wash a stone monument
- 8 people – KID FRIENDLY
- Team 1: Paint Yellow Poles
- Sand/Paint 4 sets of 4ft yellow poles along the street
- Able to paint
- 4 People
- KID FRIENDLY
*If this projects concludes early, this group is welcome to join the Elizabeth Park painting projects.
First Church lot on Main Street
Descrition: First Church owns an empty grassy lot on Main Street. We will be installing Edison Lights, Landscaping, and adding benches and picnic tables.Â
- Team 1 – Edison Light Crew
- Install 4 anchors on concrete building wall, dig 4 post holes and quick concrete set poles on other side of the property to hang the lights. Create 4 small concrete pads with an anchor for benches and picnic tables.
- Able to assist with post digging and mixing/pouring concrete
- 8 People – 16+ years old
- Team 2 – Landscape Crew
- Extend mulch area, add plants and flowers
- Able to dig and lay mulch
- 8 People 13+ yrs old
Low Impact Roles
- Team 1: Card Making
- Write cards for senior citizens. This will take place at the Eau Claire Campus.
- Open to anyone and unlimited people can participate.
- KID FRIENDLY
- Team 1: Bracelet Making
- Make cards for children in a refugee camp. This will take place at the Eau Claire Campus.
- Open to anyone and unlimited people can participate.
- KID FRIENDLY
- Community Door Hanging and Prayer
- Break into groups and canvas the town with EC Campus door hanger invites. This time can also be used to pray for the households you pass by. You will fan out from the Student Activity Center on foot. Maps of your area will be provided.
- Anyone
- KID FRIENDLY
- Team 1 – 6 People
- Team 2 – 6 People
- Team 3 – 6 People
- Team 4 – 6 People
- Meal Set Up
- Assist with getting 3 food lines set up and food on the tables. Restock as needed and assist with table clean off/packing up extra food after lunch
- ** This project is from 11:15 AM – 1:45 PM
- 12 People – Anyone 13+
- Sandwich Assembly
- PB & J are one of the three lunch options (it is vegetarian/vegan and kids like them). Assemble 200 PB & J sandwiches and put in sandwich bags.
- ** This project is from 11:15 AM – 12:15 PM
- 8 People – Anyone 13+
- Distribute Team Supplies
-  There are 30 + sites around Eau Claire. This team will gather the different site supplies at the Student Athletic Center and deliver them to the sites. Â
- **This projects is from 10:30 AM – 12 PM
- 12 People – Anyone 16+ yrs old











